Name Requirement for the request to delay, to postpone and to terminate the qualified investment project
Description The delay, postponement and termination of QIP are required to follow the procedures including the report on imports of raw materials, equipment, construction materials and import taxes.
Comments To govern the QIP in Cambodia
Validity From 03/07/2011
Validity To 31/12/9999
Reference Point 1, 2, 3
Technical Code I9
Agency Council for the Development of Cambodia
Created Date 2023-03-08 06:17:21
Updated Date 2023-03-08 06:17:21
Status publish
Measure Type Investment Measure
Legal/Regulation Directive No. 365 on Procedures for Delay, Postponement, Suspension, or Termination of Company Investment Activity
Un Code 2070-Trade-related investment measures, n.e.s

Resources

Do you have any queries

If you have any queries, please contact us.

This measure applies to commodity/s


HS Code Description
11773 – – – Blocks
11774 – – – Slabs
11775 – – Crude or roughly trimmed
11776 – – Merely cut, by sawing or otherwise, into blocks or slabs of a rectangular (including square) shape
11777 – Other monumental or building stone
11778 – Pebbles, gravel, broken or crushed stone, of a kind commonly used for concrete aggregates, for road metalling or for railway or other ballast, shingle and flint, whether or not heat-treated
11779 – Macadam of slag, dross or similar industrial waste, whether or not incorporating the materials cited in subheading 2517.10
11780 – Tarred macadam
11781 – – Of marble
11782 – – Other
Next Entries
Old Entries