Name Requirement for the request to delay, to postpone and to terminate the qualified investment project
Description The delay, postponement and termination of QIP are required to follow the procedures including the report on imports of raw materials, equipment, construction materials and import taxes.
Comments To govern the QIP in Cambodia
Validity From 03/07/2011
Validity To 31/12/9999
Reference Point 1, 2, 3
Technical Code I9
Agency Council for the Development of Cambodia
Created Date 2023-03-08 06:17:21
Updated Date 2023-03-08 06:17:21
Status publish
Measure Type Investment Measure
Legal/Regulation Directive No. 365 on Procedures for Delay, Postponement, Suspension, or Termination of Company Investment Activity
Un Code 2070-Trade-related investment measures, n.e.s

Resources

Do you have any queries

If you have any queries, please contact us.

This measure applies to commodity/s


HS Code Description
11843 – Other
11844 – Antimony ores and concentrates
11845 – Other
11846 Granulated slag (slag sand) from the manufacture of iron or steel.
11847 Slag, dross (other than granulated slag), scalings and other waste from the manufacture of iron or steel.
11848 – – Hard zinc spelter
11849 – – Other
11850 – – Leaded gasoline sludges and leaded anti-knock compound sludges
11851 – – Other
11852 – Containing mainly copper
Next Entries
Old Entries