Name | Requirement for the request to delay, to postpone and to terminate the qualified investment project |
Description | The delay, postponement and termination of QIP are required to follow the procedures including the report on imports of raw materials, equipment, construction materials and import taxes. |
Comments | To govern the QIP in Cambodia |
Validity From | 03/07/2011 |
Validity To | 31/12/9999 |
Reference | Point 1, 2, 3 |
Technical Code | I9 |
Agency | Council for the Development of Cambodia |
Created Date | 2023-03-08 06:17:21 |
Updated Date | 2023-03-08 06:17:21 |
Status | publish |
Measure Type | Investment Measure |
Legal/Regulation | Directive No. 365 on Procedures for Delay, Postponement, Suspension, or Termination of Company Investment Activity |
Un Code | 2070-Trade-related investment measures, n.e.s |
If you have any queries, please contact us.
HS Code | Description |
---|---|
13323 | – – Film, tape and optical disc cases |
13324 | – – Other |
13325 | – – – Aseptic bags reinforced with aluminium foil (other than retort pouches): – – – – Of a width of 315 mm or more and of a length of 410 mm or more, incorporating a sealed gland |
13326 | – – – Aseptic bags reinforced with aluminium foil (other than retort pouches): – – – – Other |
13327 | – – – Other: – – – – Aseptic bags not reinforced with aluminium foil (other than retort pouches), of a width of 315 mm or more and of a length of 410 mm or more, incorporating a sealed gland |
13328 | – – – Other: – – – – Other |
13329 | – – – Aseptic bags whether or not reinforced with aluminium foil (other than retort pouches), of a width of 315 mm or more and of a length of 410 mm or more, incorporating a sealed gland |
13330 | – – – Other |
13331 | – – Multi-layer fibreglass reinforced fuel containers |
13332 | – – Other |